- You are in:
-
-
Home
Constructions
Sanitary centres and residences
- Elementary & Primary School Onze de Setembre
-
Home
Constructions
Sanitary centres and residences
Elementary & Primary School Onze de Setembre
- » Location: Sant Quirze del Vallès
- » End date: 31/07/2001
- » Budget: 2.100.415,18€
School built on a plot of 6.300 square meters, consisting of several blocks of one or two floors, extensive landscaped recreational areas and sports facilities. The structure of the building with pilot, based foundation, walls and slabs of concrete. Covers finished with sheet zinc. The floor area is 2.313 square meters.
IMAGES